Massive Selection for Direct Rapid Tooling - Fast delivery in 3 weeks rapid tooling case – Colead
Massive Selection for Direct Rapid Tooling - Fast delivery in 3 weeks rapid tooling case – Colead Detail:
Description
Request– Complete a rapid tooling and finish 60 parts for testing in 3 weeks. It is a part is for the automotive electronic system.
Problem – Although this was an internal part perfection was called for to reduce noise (created by air flow) as much as possible. To achieve the desired end result, we need to ensure there is no flash and no interior surface imperfections.
Solution – To achieve perfection. During injection molding, perfect tool finishing and extra attention is need to be paid to quality control processes.
Result – Rapid tooling was fabricated on time. Injection molded parts were delivered within 3 weeks.
Production Process: Rapid Tooling & Small-Volume Injection Molding.
Quantity: 1 Tool & 50 Parts.
Tooling Material: P20.
Production Material: PP.
Finishing: Straight From Tooling.
Lead Time: 3 Weeks.
Project Summary
Rapid injection molding is a common project request from our Automotive customers.
There are quite a lot of testing required on many Automotive parts, and generally, the time lines are very tight. But this is also where our experiences in rapid prototyping comes in.
Rapid prototyping work requires excellent quality at the first time around. If quality was lacking, we would not last long in the rapid prototyping world.
It is that attention to detail and quality in rapid prototyping that helps us win projects when it comes to rapid low-volume injection molding. Deliver parts fast and also deliver excellence.
We understand the demands from our clients in automotive and transportation industries, we are looking forward to work with you to ensure they are met and exceeded.
Product detail pictures:
Related Product Guide:
We've been convinced that with joint efforts, the enterprise between us will bring us mutual benefits. We are able to assure you product or service quality and aggressive cost for Massive Selection for Direct Rapid Tooling - Fast delivery in 3 weeks rapid tooling case – Colead , The product will supply to all over the world, such as: Malaysia, Libya, Luxembourg, we've got all day online sales to make sure the pre-sale and after-sale service in time. With all these supports, we can serve every customer with quality product and timely shipping with highly responsibility. Being a young growing company, we might not the best, but we are trying our best to be your good partner.
It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.