Massive Selection for Direct Rapid Tooling - Fast delivery in 3 weeks rapid tooling case – Colead
Massive Selection for Direct Rapid Tooling - Fast delivery in 3 weeks rapid tooling case – Colead Detail:
Description
Request– Complete a rapid tooling and finish 60 parts for testing in 3 weeks. It is a part is for the automotive electronic system.
Problem – Although this was an internal part perfection was called for to reduce noise (created by air flow) as much as possible. To achieve the desired end result, we need to ensure there is no flash and no interior surface imperfections.
Solution – To achieve perfection. During injection molding, perfect tool finishing and extra attention is need to be paid to quality control processes.
Result – Rapid tooling was fabricated on time. Injection molded parts were delivered within 3 weeks.
Production Process: Rapid Tooling & Small-Volume Injection Molding.
Quantity: 1 Tool & 50 Parts.
Tooling Material: P20.
Production Material: PP.
Finishing: Straight From Tooling.
Lead Time: 3 Weeks.
Project Summary
Rapid injection molding is a common project request from our Automotive customers.
There are quite a lot of testing required on many Automotive parts, and generally, the time lines are very tight. But this is also where our experiences in rapid prototyping comes in.
Rapid prototyping work requires excellent quality at the first time around. If quality was lacking, we would not last long in the rapid prototyping world.
It is that attention to detail and quality in rapid prototyping that helps us win projects when it comes to rapid low-volume injection molding. Deliver parts fast and also deliver excellence.
We understand the demands from our clients in automotive and transportation industries, we are looking forward to work with you to ensure they are met and exceeded.
Product detail pictures:
Related Product Guide:
Dedicated to strict high-quality management and considerate shopper company, our experienced team associates are normally available to discuss your requirements and ensure full shopper gratification for Massive Selection for Direct Rapid Tooling - Fast delivery in 3 weeks rapid tooling case – Colead , The product will supply to all over the world, such as: Philippines, Paraguay, Kuwait, We've been persisting in the business essence "Quality First, Honoring Contracts and Standing by Reputations, providing customers with satisfying products and service. " Friends both at home and abroad are warmly welcome to establish everlasting business relations with us.
The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.



